Case Study - Wembley Stadium


Millbrook provided much of the specialist finishing works to the internal public areas and private boxes in the Wembley Stadium in London.


Millbrook was called upon to finish the wall coverings in FR High Build Polyurethane for both large flat areas and multi-faced ‘Diagrid’ finishes.


The design and installation schedule required that both factory and ‘on-site’ finishing was carried out to achieve the highest of ‘mirror’ quality and durability.




The Millbrook Core Skills


  • Management Clarity and responsiveness
  • The on-going development of our staff
  • Production ,Quality and Performance Control
  • Logistics and ‘Remote Location’ control